Analisis Perbandingan Biaya Dan Waktu Pengecoran Site Mix Dengan Ready Mix Pada Proyek Villa Banana One Bedroom

Permana, I Gede Adi Artha and Sudiarta, I Komang and Dewi, I Gusti Wulan Krisna (2023) Analisis Perbandingan Biaya Dan Waktu Pengecoran Site Mix Dengan Ready Mix Pada Proyek Villa Banana One Bedroom. Undergraduate thesis, Politeknik Negeri Bali.

[img] Text (Cover-Bab 1, Bab 5 dan Referensi)
RAMA_22302_2215164050_NIDN0026097704_NIDN0017118804_part.pdf - Accepted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (1MB)
[img] Text (Full Text)
RAMA_22302_2215164050_full.pdf - Accepted Version
Restricted to Repository staff only

Download (4MB)

Abstract

ABSTRAK Pada proyek Villa Banana pembangunan terdiri atas 7 unit villa one bedroom dan 6 unit villa two bedroom masing – masing 2 lantai. Pembangunan villa one bedroom ini terdiri dari struktur pondasi bawah berupa pondasi borepile, dan raft pondasi, sedangkan struktur atas adalah kolom lantai 1, balok lantai 1, plat lantai 1, kolom lantai 2, balok rooftop, plat lantai rooftop beton bertulang. Penelitian dilakukan karena kurang efektifnya dilapangan penggunaan ready mix di lapangan karena terbatasnya armada truck mixer dengan kapasitas 2,5 m³ oleh batching plant. Jika dilapangan menggunakan truck mixer dengan kapasitas 5 m³ akan terkendala akses untuk ke proyek. Tujuan dari penelitian ini melakukan perbandingan dari sisi biaya, waktu, dan mencari alternatif yang lebih baik digunakan dalam proyek Banana Villa one Bedroom. Melalui hasil analisis pekerjaan pengecoran dengan metode site mix dan ready mix dapat disimpulkan perbadingan dari pekerjaan struktur yang ditinjau pengecoran Banana Villa one Bedroom dengan metode pengecoran site mix Rp. 1.159.371,56, sedangkan metode pengecoran Dalam beberapa jenis pekerjaan seperti pondasi bore pile dengan biaya pengecorannya sebesar Rp. 1.553.869,00 dengan waktu pengerjaan 0,7 hari, sedangkan ready mix biaya pengecorannya sebesar Rp. 3.515.193,00 dengan waktu pengerjaan 0,85 hari. Kolom ground floor dengan biaya pengecorannya sebesar Rp. 1.471.266,00 dengan waktu pengerjaan 0,8 hari, sedangkan ready mix biaya pengecorannya sebesar Rp. 2.687.057,00 dengan waktu pengerjaan 1 hari. Kolom 1st floor dengan biaya pengecorannya sebesar Rp. 3.606.157,00 dengan waktu pengerjaan 1,07 hari, sedangkan ready mix biaya pengecorannya sebesar Rp. 5.839.270,00 dengan waktu pengerjaan 1,1 hari. Plat lantai dan balok rooftop dengan biaya pengecoran sebesar Rp. 8.918.839,00 dengan waktu pengerjaan 0,28 hari, sedangkan ready mix biaya pengecorannya sebesar Rp. 17.539.560,00 dengan waktu pengerjaan 0,7 hari. Dari item pekerjaan struktur di atas metode pengecoran site mix lebih unggul dalam segi durasi waktu dan biaya. Tetapi dalam pengecoran raft pondasi dengan biaya pengecoran sebesar Rp. 11.275.449,00 dengan waktu pengerjaan 1,3 hari, sedangkan ready mix biaya pengecorannya sebesar Rp. 19.049.300,00 dengan waktu pengerjaan 1,4 hari. plat lantai dan balok 1 st Floor dengan biaya sebesar Rp. 6.749.237,00 dengan waktu pengerjaan 1,1 hari, sedangkan ready mix biaya pengecorannya sebesar Rp. 15.839.270,00 dengan waktu pengerjaan 0,9 hari. Alternatif yang lebih efisien untuk pembangunan proyek Banana Villa one Bedroom adalah metode pengecoran site mix, karena dari segi harga dan waktu sudah jelas metode pengecoran site mix lebih unggul. Kata Kunci : biaya, waktu, site mix dan ready mix ABSTRACT In the Villa Banana project, the development consists of 7 units of one bedroom villas and 6 units of two bedroom villas each consisting of 2 floors. The construction of this one bedroom villa consists of a lower foundation structure in the form of a boredpile foundation, and a foundation raft, while the upper structure is a 1st floor column, 1st floor beam, 1st floor plate, 2nd floor column, rooftop beam, reinforced concrete rooftop floor plate. The research was conducted due to the ineffectiveness in the field of using ready mix in the field due to the limited fleet of mixer trucks with a capacity of 2.5 m^3 by batching plant. If in the field using a mixer truck with a capacity of 5 m^3, access to the project will be constrained. The purpose of this study is to compare in terms of cost, time, and find better alternatives used in the Banana Villa one Bedroom project. Through the results of the analysis, it can be concluded that the comparison of each Banana Villa one Bedroom casting component work with the sitemix casting method is Rp. 1,159,371.56, while the casting method In some types of work such as bored pile foundations with casting costs of Rp. 1,553,869.00 with a processing time of 0.7 days, while ready mix casting costs of Rp. 3,515,193.00 with a processing time of 0.85 days. The ground floor column with a casting cost of Rp. 1,471,266.00 with a processing time of 0.8 days, while the ready mix casting cost is Rp. 2,687,057.00 with a processing time of 1 day. The 1st floor column with a casting cost of Rp. 3,606,157.00 with a processing time of 1.07 days, while the ready mix casting cost is Rp. 5,839,270.00 with a processing time of 1.1 days. Floor plates and rooftop beams with a casting fee of Rp. 8,918,839.00 with a processing time of 0.28 days, while ready mix casting costs of Rp. 17,539,560.00 with a processing time of 0.7 days. From the above structural work items, the site mix casting method is superior in terms of duration, time and cost. But in casting the foundation raft with a casting cost of Rp. 11,275,449.00 with a processing time of 1.3 days, while the ready mix casting cost is Rp. 19,049,300.00 with a processing time of 1.4 days. 1st Floor plate and beam with a cost of Rp. 6,749,237.00 with a processing time of 1.1 days, while ready mix casting costs of Rp. 15,839,270.00 with a processing time of 0.9 days. A more efficient alternative to the construction of the one Bedroom Banana Villa project is the site mix casting method, because in terms of price and time it is clear that the site mix casting method is superior. Keywords: cost, time, site mix and ready mix

Item Type: Thesis (Undergraduate)
Subjects: Ilmu Teknik
Ilmu Teknik > Teknik Sipil Dan Perencanaan Tata Ruang > Bidang Teknik Sipil Lain Yang Belum Tercantum
Divisions: Jurusan Teknik Sipil > Prodi D4 Manajemen Proyek Konstruksi > Skripsi
Depositing User: I Gede Adi Artha Permana
Date Deposited: 12 Sep 2023 04:29
Last Modified: 12 Sep 2023 04:29
URI: http://repository.pnb.ac.id/id/eprint/10055

Actions (login required)

View Item View Item