Analisis Perbandingan Volume Pekerjaan Struktur Menggunakan Tekla Structures Dengan Metode Konvensional Pada Proyek Pembangunan Gedung PASTORAN SANTO PAULUS SINGARAJA

Sthanu, I Putu Gede Bagus Luhur Swambhara and Suasira, I Wayan and Suparta, I Wayan (2022) Analisis Perbandingan Volume Pekerjaan Struktur Menggunakan Tekla Structures Dengan Metode Konvensional Pada Proyek Pembangunan Gedung PASTORAN SANTO PAULUS SINGARAJA. Diploma thesis, Politeknik Negeri Bali.

[img] Text (Full Text)
RAMA_22401_1915113046_full.pdf - Accepted Version
Restricted to Repository staff only

Download (14MB) | Request a copy
[img] Text (Cover - Bab 1, Bab 5 dan Referensi)
RAMA_22401_1915113046_0021027004_0028046302_part.pdf - Published Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (2MB)

Abstract

The calculation of the volume of work is one of the critical points in preparing a budget plan, both in the planning stage and the implementation stage. The miscalculation of the volume of work will be fatal due to the discrepancy of the volume of the calculation of work with the realized volume in the field. Errors at the time of calculation can occur from for example: arithmetic errors, namely addition, multiplication, division, and comma number format. [4]. The current development of construction is not only in sophisticated implementation tools, in terms of supporting applications it has also experienced significant developments, this development is the presence of BIM (Building Information Modelling). BIM is an application method that supports the entire design phase, allowing for better analysis and control of manual processes. Upon completion, the created model will contain the geometry and accurate data needed to support construction, fabrication, and procurement activities in order to realize the building [5]. So that the above mistakes can be prevented. From the results of the analysis and discussion, the difference in volume in pile work was obtained, which was 1%, in concrete work it was obtained 4.21%, and in the finishing work it was obtained 10.02%.

Item Type: Thesis (Diploma)
Subjects: Ilmu Teknik
Ilmu Teknik > Teknik Sipil Dan Perencanaan Tata Ruang
Ilmu Teknik > Teknik Sipil Dan Perencanaan Tata Ruang > Bidang Teknik Sipil Lain Yang Belum Tercantum
Divisions: Jurusan Teknik Sipil > Prodi D3 Teknik Sipil > Tugas Akhir
Depositing User: I Putu Gede Bagus Luhur Swambhara Sthanu
Date Deposited: 24 Sep 2022 06:30
Last Modified: 30 Oct 2022 00:00
URI: http://repository.pnb.ac.id/id/eprint/2373

Actions (login required)

View Item View Item