Analisis Kebutuhan Modal Kerja Dan Pengendalian Biaya Berdasarkan Varian Biaya Pada Proyek Pembangunan Villa Simba Pererenan

Widyananta, I Putu and Sudiasa, I Wayan and Ardika, I Wayan Dana (2022) Analisis Kebutuhan Modal Kerja Dan Pengendalian Biaya Berdasarkan Varian Biaya Pada Proyek Pembangunan Villa Simba Pererenan. Repositori Politeknik Negeri Bali..

[img] Text (Artikel)
RAMA_22302_1815124007_artikel.pdf - Accepted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (392kB)
[img] Text (Surat Pernyataan Bebas Plagiarisme)
RAMA_22302_1815124007_pernyataan.pdf - Supplemental Material
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (235kB)
Official URL: https://repository.pnb.ac.id

Abstract

Abstract The necessity for working capital and cost control in a construction project aims to ensure that the project is done in accordance with the contract or earlier than the project implementation time plan while still concentrating on the cost, time and quality limits of the project. The data used in this research are primary data and secondary data. In addition, the results of the cash flow analysis during the project shows that the working capital needed for Simba Pererenan Villa’s construction project was Rp. 25,000,000.00 from its own capital. Based on the payment terms, it was possible to see that the cash flow experienced a deficit, as a result, the company issued its cash of Rp. 25,000,000 on October 21, 2021. Moreover, the evaluation of the concept of value analysis in terms of costs in months I to month II could be seen from the value of the cost variance (CV) showing the number of (-). However, the evaluation of project implementation in months III to VIII was seen from the value of the cost variance (CV) showing the number of (+). Based on the conditions that occurred, it was known that the profit obtained was Rp. 865,827,443.02. Therefore, the analysis in terms of time could be seen that the project ran smoothly from July 2021 to January 2022, yet in February, the project experienced a slight delay and in March 2022 the project could be done in accordance with the plan. Keywords : Working Capital, Cashflow, Cost and Schedule Variants

Item Type: Article
Subjects: Ilmu Teknik
Ilmu Teknik > Teknik Sipil Dan Perencanaan Tata Ruang > Bidang Teknik Sipil Lain Yang Belum Tercantum
Divisions: Jurusan Teknik Sipil > Prodi D4 Manajemen Proyek Konstruksi > Skripsi
Depositing User: I Putu Widyananta
Date Deposited: 24 Sep 2022 06:46
Last Modified: 29 Oct 2022 07:22
URI: http://repository.pnb.ac.id/id/eprint/2457

Actions (login required)

View Item View Item