Analysis of Financial Feasibility of Tourism Transport and Shuttle Transport Business

Tapa, I Gede Fery Surya and Kumara, I Nyoman Indra and Susila, I Nengah Darma and Sutapa, I Ketut (2022) Analysis of Financial Feasibility of Tourism Transport and Shuttle Transport Business. LOGIC : Jurnal Rancang Bangun dan Teknologi, 22 (3). pp. 276-282. ISSN 1412114X

[img] Text (Similarity Check)
e. Report - Paper+_+I+Gede+Fery+Surya+Tapa_+LOGIC+2022.pdf - Published Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (190kB)
Official URL: https://doi.org/10.31940/logic.v22i3.276-282

Abstract

Before the Covid-19 pandemic, an increase in the number of foreign and domestic tourists. With the increase in the number of tourists, the number of tourist travel efforts to increase the mode of transportation, with the aim of travel and shuttle visits increases every year. The objectives of the study are to analyze most of the BOK of tourist and shuttle transportation, to analyze the revenue of financial transportation and shuttle transportation, and to analyze the feasibility of tourist and shuttle transportation. The data needed for this study are primary data obtained from questionnaire surveys and interviews, and secondary data obtained through related institutions. The total operational cost of the tourist transportation vehicle is Rp. 5,937,007,065 12 vehicles / year, shuttle transportation of Rp. 5,975,220,122 17 vehicles / year. The total tourism transportation revenue is Rp. 7,158,878,400 12 vehicles / year, and shuttle transportation of Rp. 8,978,130,221 17 vehicles / year. The financial feasibility of tourist transportation with an NPV value of Rp. 100,640,493,054> 0 (feasible), BCR value 1.95> 1 (feasible), IRR value 42.478%> 15% MARR (feasible), and PBP time of 7 years and 1 month. Shuttle transportation NPV value of Rp. 734,194,558> 0 (feasible), BCR value 1.02> 1 (feasible), IRR value 19.649%> 15% MARR (feasible), and PBP time of 6 years 4 months. Sensitivity analysis of tourist transportation costs increased by 34%, income decreased by 34% and shuttle costs increased by 1.5%, income decreased by 1.5%. Losses during 2020-2021, for tourist transportation amounted to -Rp. 10,782,606,379 12 vehicles / 2 years, shuttle transportation of -Rp. 16,866,802,314 17 vehicles / 2years

Item Type: Article
Subjects: Ilmu Teknik
Ilmu Teknik > Teknik Sipil Dan Perencanaan Tata Ruang > Transportasi
Divisions: Jurusan Teknik Mesin > Prodi D3 Teknik Mesin > Publikasi
Jurusan Teknik Sipil > Prodi D2 Fondasi, Beton dan Pengaspalan Jalan > Publikasi
Depositing User: I Ketut Sutapa
Date Deposited: 17 Aug 2023 01:08
Last Modified: 17 Aug 2023 01:08
URI: http://repository.pnb.ac.id/id/eprint/6950

Actions (login required)

View Item View Item