Items where Author is "Ramia, I Nyoman"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Jump to: Article | Thesis
Number of items: 21.

Article

Diva, Anak Agung Gde Ngurah Rama and Sudiasa, I Wayan and Ramia, I Nyoman (2022) Analisis Waste Material Proyek Berbasis Metode Pareto Dan Fault Tree Analyis. Repositori Politeknik Negeri Bali.

Sarimartha, I Komang Taruna and Ramia, I Nyoman and Indrayanti, Anak Agung Putri (2022) Analisis Tingkat Produktivitas Tenaga Kerja Pada Proyek Pembangunan Embung Getakan Klungkung. Repositori Politeknik Negeri Bali.

Army, B. and Sujahtra, I Wayan and Ramia, I Nyoman and Sutapa, I Ketut (2022) Review of The Use of Cross Iron in Reinforced Concrete Column as An Alternative to Shoes Column. International research journal of engineering, IT & scientific research, 8 (5). pp. 178-186. ISSN 2454-2261

Sutapa, I Ketut and Sutapa, I Nyoman and Suparta, I Wayan Darya and Ramia, I Nyoman and Tuhujati, Denin Lintang (2021) Analysis Of Ohs Costs In The Road Construction Project Of Singaraja City – Mengwi (Short Cut Bedugul Point 5 - 6). Logic : Jurnal Rancang Bangun dan Teknologi, 21 (2). pp. 97-100. ISSN 1412114X

Thesis

Astawan, Pasek Komang Aditya and Ramia, I Nyoman and Paramita, I Gusti Ayu Putu Dewi (2023) Analisis Perbandingan Biaya dan Waktu Pekerjaan Bekisting Menggunakan Perancah Scaffolding dan Perancah Bambu pada Proyek Pembangunan Gedung Pasar Sukawati Blok C. Undergraduate thesis, Politeknik Negeri Bali.

Pardana, I Wayan Yoga and Sutapa, I Ketut and Ramia, I Nyoman (2023) Analisis Produktivitas Pelaksanaan Pekerjaan Pengecoran Kolom Menggunakan Concrete Pump Dan Concrete Bucket Pada Pembangunan Gedung Fakultas Matematika Dan Ilmu Pengetahuan Alam Universitas Udayana Ditinjau Dari Segi Biaya Dan Waktu. Diploma thesis, Politeknik Negeri Bali.

Karang, Felisianus and Ramia, I Nyoman and Sujahtra, I Wayan (2023) Tinjauan Perencanaan Dan Pelaksanaan Pekerjaan Pondasi Bore Pile (Studi Kasus Pembangunan Vila Nila Residnce, Canggu). Diploma thesis, Politeknik Negri Bali.

Kusuma, I Gede Adi Wijaya Kusuma and Ramia, I Nyoman and Sukarmawati, Yuliana (2023) Analisis Perbandingan Pelaksanaan Pekerjaan Struktur Pelat Lantai Metode Boundeck Dan Konvensional Ditinjau Dari Segi Biaya Dan Waktu ( Studi Kasus Proyek Pembangunan Gedung Steak House Canggu ). Undergraduate thesis, Politeknik Negeri Bali.

Pranata, I Made Abi and Wibawa, I Gede Sastra and Ramia, I Nyoman (2023) Perencanaan Kapasitas Dukung Dan Metode Pelaksanaan Pondasi Bored Pile Dengan Metode Bor Kering Pada Pembangunan Teratai Grand Village Canggu. Diploma thesis, Politeknik Negeri Bali.

Putra, I Gede Wahyu Redana and Sutapa, I Ketut and Ramia, I Nyoman (2023) Penerapan Keselamatan Dan Kesehatan Kerja Pada Proyek Rekontruksi Jalan Gunung Galunggung Di Kota Denpasar. Diploma thesis, Politeknik Negeri Bali.

Arta, I Putu Dedy Sedana and Ramia, I Nyoman and Purnawirati, I Gusti Ayu Neny (2023) Produktivitas Pekerjaan Pengecoran Plat Lantai 2 Dan Balok Dengan Concrete Pump Pada Proyek Pembangunan Ruko The Promenade. Diploma thesis, Politekneik Negeri Bali.

Pradana, I Wayan Eka Ari and Ramia, I Nyoman and Budiadi, I Made (2023) Perhitungan Kuantitas Pengecoran dengan Concrete Pump dan Truck Mixer Pada Pekerjaan Pondasi Raft Gedung Tsunami Shelter Kuta. Diploma thesis, Politeknik Negeri Bali.

Putra, I Made Dicky and Ramia, I Nyoman and Suparta, I Wayan (2022) Produktivitas Excavator PC78 Terhadap Galian Tanah Keras Limestone Pada Pembangunan Pandawa Resindence Daerah Kuta Selatan. Diploma thesis, Politeknik Negeri Bali.

Suratmaja, I Nyoman Kevin and Ramia, I Nyoman and Budiadi, I Made (2022) Tinjauan Biaya Dan Waktu Pada Pelaksanaan Pengecoran Beton Site Mix Dan Beton Ready Mix Pada Proyek Pembangunan Villa Maharaja Pererenan. Diploma thesis, Politeknik Negeri Bali.

Sarimartha, I KomangTaruna and Ramia, I Nyoman and Indrayanti, Anak Agung Putri (2022) Analisis Tingkat Produktivitas Tenaga Kerja Pada Proyek Pembangunan Embung Getakan Klungkung. Undergraduate thesis, Politeknik Negeri Bali.

Satya, I Komang Adi and Mudhina, Made and Ramia, I Nyoman (2022) Analisis Investasi Pembangunan Rumah Kos Dan Ruko Di Jalan Gunung Talang, Padangsambian, Denpasar. Diploma thesis, Politeknik Negeri Bali.

Latif, Fendy Gus and Ramia, I Nyoman and Putra, I Gusti Putu Adi Suartika (2022) Perbandingan Metode Pengecoran Dengan Concrete Pump Dan Konvensional Terhadap Biaya Dan Waktu Pada Proyek Gedung DPRD Bangli. Diploma thesis, Politeknik Negeri Bali.

Islami, Dinar Git and Ramia, I Nyoman and Sutapa, I Ketut (2022) Analisis Perbandingan Rencana Anggaran Biaya Dan Rencana Anggaran Pelaksanaan Pada Proyek Pembangunan Struktur Showroom Dan Toko Di Jalan Sunset Road. Undergraduate thesis, Politeknik Negeri Bali.

Astawan, Pasek Komang Aditya and Ramia, I Nyoman and Purnawirati, I Gusti Ayu Neny (2022) Tinjauan Biaya dan Waktu Penggunaan Perancah Scaffolding dan Perancah Bambu Pada Pembangunan Proyek Gedung Pasar Sukawati Blok C. Diploma thesis, Politeknik Negeri Bali.

Gusnawan, I Gede and Wiraga, I Wayan and Ramia, I Nyoman (2022) Kajian Daya Dukung Pondasi Bore Pile Dan Biaya Pada Proyek Pembangunan Villa Tumbak Bayuh Jl. Veteran, Banjar Gunung, Desa Buduk, Kecamatan Mengwi, Kabupaten Badung, Provinsi Bali. Diploma thesis, Politeknik Negeri Bali.

Diva, Anak Agung Gde Ngurah Rama and Sudiasa, I Wayan and Ramia, I Nyoman (2022) Analisis Waste Material Proyek Berbasis Metode Pareto Dan Fault Tree Analyis Studi Kasus Proyek Pembangunan Rumah Susun Asrama Polisi Sanglah. Undergraduate thesis, Politeknik Negeri Bali.

This list was generated on Sun May 19 11:36:26 2024 PDT.