Up a level
Group by: Item Type | No Grouping
Number of items: 1.

Thina, Nabila Amaretha Fa (2025) Pengaruh Keterlambatan Waktu Pelaksanaan terhadap Biaya Pekerjaan (Studi Kasus : Proyek Pembangunan Hotel Hilton Garden Inn Extension, Nusa Dua). Undergraduate thesis, Politeknik Negeri Bali.

This list was generated on Sat Dec 20 07:49:31 2025 +08.