![]() | Up a level |
Asih, Putu Ayu Suka Ari and Sudiarsa, Made and Triadi, I Nyoman Sedana (2022) Analisis Kinerja Biaya dan Waktu Proyek Konstruksi Pada Masa Pandemi Covid-19 Dengan Metode Nilai Hasil Serta Penerapan Crashing Program (Studi Kasus: Proyek Pembangunan Gedung Pengadilan Tinggi Denpasar). Undergraduate thesis, Politeknik Negeri Bali.
Pratama, I Kadek Wira Aditya and Wiraga, I Wayan and Paramita, I Gusti Ayu Putu Dewi (2022) Perbandingan Biaya Dan Waktu Pelaksanaan Pekerjaan Pasangan Dinding Bata Merah Dan Batako Pada Pembangunan Sekolah Madrasah Ibtidaiyah NEGERI (MIN) 7 JEMBRANA TEKNIK SIPIL. Diploma thesis, Politeknik Negeri Bali.
Putra, Kadek Pande Dio Adi Kartika and Jaya, I Made and Kader, I Made Suardana (2022) Perencanaan Struktur Gedung Kantor Camat Payangan Menggunakan Struktur Baja. Diploma thesis, Politeknik Negeri Bali.
Santiana, I Made Anom and Wibawa, I Gede Sastra and Yasa, I Made Tapa and Suasira, I Wayan and Sutapa, I Ketut (2022) Factors Caused for Delays and Alternatives in The Denpasar Living World Mall Building Project. International research journal of engineering, IT & scientific research, 8 (6). pp. 299-305. ISSN 2454-2261
Setiawan, I Komang Arya and Intara, I Wayan and Pramana, I Made Wahyu (2022) Metode Pelaksanaan Pekerjaan Pondasi Pada Pembangunan Gedung Poliklinik Exekutif Dan Rehab Rsud Sanjiwani Gianyar. Diploma thesis, Politeknik Negeri Bali.
Sudiarsa, Made and Sudiasa, I Wayan and Wibawa, I Gede Sastra and Sutapa, I Ketut (2023) Analysis of the Model of Integrated Utilities Network Provision and Infrastructure in Denpasar City. International Journal of Physical Sciences and Engineering, 7 (2). pp. 11-22. ISSN 2550-6951
Wiranata, Putu Heri and Aryawan, I Gede Made Oka and Salain, Putu Dana Pariawan (2023) Analisis Kelayakan Investasi Pada Pembangunan Dan Operasional Villa Kizmet Fit Tong Bashier. Undergraduate thesis, Politeknik Negeri Bali.
Yasada, Gede and Sutapa, I Ketut (2020) Study of the Potential Traffic Congestion in Intersection of Three the Sunset Road, Kerobokan Road, Seminyak Road-Badung, Bali. International Journal of Psychosocial Rehabilitation, 24 (8). pp. 1475-7192. ISSN 1475-7192,
Yasada, Gede and Sutapa, I Ketut and Setyono, Evin Yudhi (2022) Quick and Concise Land Boundary Mapping Using a Drone at Villa Buccu, Kerobokan, Badung, Bali. International research journal of engineering, IT & scientific research, 8 (5). pp. 187-196. ISSN 2454-2261
Yasada, Gede and Sutapa, I Ketut and Sudiarsa, Made (2020) Concentrations of Sediment Transport in Badung Strait by Hydrodynamic Model. International Journal of Psychosocial Rehabilitation, 24 (5). pp. 5846-5856. ISSN 1475-7192