Up a level
Group by: Item Type | No Grouping
Number of items: 1.
Dika, I Gede Indra and Indrayanti, Anak Agung Putri and Ardika, I Wayan Dana (2023) Analisis Perbandingan Biaya Antara Penambhan Tenaga Kerja Dengan Waktu Kerja Terhadap Percepatan Pelaksanaan Proyek Dengan Metode Time Cost Trade Off. Undergraduate thesis, Politeknik Negeri Bali.