Up a level
Group by: Item Type | No Grouping
Number of items: 1.

Pratama, I Kadek Wira Aditya and Wiraga, I Wayan and Paramita, I Gusti Ayu Putu Dewi (2022) Perbandingan Biaya Dan Waktu Pelaksanaan Pekerjaan Pasangan Dinding Bata Merah Dan Batako Pada Pembangunan Sekolah Madrasah Ibtidaiyah NEGERI (MIN) 7 JEMBRANA TEKNIK SIPIL. Diploma thesis, Politeknik Negeri Bali.

This list was generated on Sat May 17 23:13:27 2025 +08.