Up a level
Group by: Item Type | No Grouping
Number of items: 1.

Putra, I Wayan Agus Pramana and Wiraga, I Wayan and Suasira, I Wayan (2023) Analisis Produktivitas Dan Anggaran Biaya Pelaksanaan Pekerjaan Bored Pile Pada Proyek Revitalisasi Hotel Grand Inna Bali Beach Kawasan Sanur Area IBBG ( Inna Bali Beach Garden ). Diploma thesis, Politeknik Negeri Bali.

This list was generated on Tue Jun 24 14:15:27 2025 +08.