Evaluation of The Implementation of Occupational Safety and Health Management Systems on The Ayana Nort Wing Bali Construction Project

Sutapa, I Ketut and Yuni, Ni Kadek Sri Ebtha and Susila, I Nengah Darma and Wibawa, I Gede Sastra and Santiana, I Made Anom (2022) Evaluation of The Implementation of Occupational Safety and Health Management Systems on The Ayana Nort Wing Bali Construction Project. Sloap Journal Science Literature and Open Acces Publishing, 8 (1). pp. 1-6. ISSN 2454-2261

[img] Text (Similarity Check)
b. editorirjeis,+IRJEIS-2034+1-6.pdf - Supplemental Material
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (354kB)
Official URL: https://doi.org/10.21744/irjeis.v8n1.2034

Abstract

Building construction projects have a high level of risk of work accidents, especially for workers in the field. Therefore, at the time of implementation of construction work, it is necessary to evaluate the implementation of occupational safety and health management system (SMK3) to provide a sense of security to workers in the field of this research aimed at evaluating SMK3. This research uses qualitative and quantitative methods to know the implementation of SMK3, by taking data by conducting structured interviews conducted on the building construction project Ayana Nort Wing Bali. Analysis conducted a descriptive analysis based on Government Regulation of the Republic of Indonesia No.50, 2012 advanced with 12 criteria containing 166 criteria elements. The result of this study is the application of PP No. 50 of 2012 for the advanced level of 92.89% categorized as satisfactory. In addition, there are 14 that have not been implemented. This the company that the evaluation level of occupational safety and health management system (SMK3) in the building construction project Ayana North Wing Bali is the level of application is very satisfactory for the project.

Item Type: Article
Subjects: Ilmu Teknik
Ilmu Teknik > Teknik Sipil Dan Perencanaan Tata Ruang > Bidang Teknik Sipil Lain Yang Belum Tercantum
Divisions: Jurusan Teknik Mesin > Prodi D3 Teknik Mesin > Publikasi
Jurusan Teknik Sipil > Prodi D2 Fondasi, Beton dan Pengaspalan Jalan > Publikasi
Jurusan Teknik Sipil > Prodi D4 Manajemen Proyek Konstruksi > Publikasi
Jurusan Teknik Sipil > Prodi D3 Teknik Sipil > Publikasi
Depositing User: I Ketut Sutapa
Date Deposited: 06 Aug 2023 04:51
Last Modified: 06 Aug 2023 04:51
URI: http://repository.pnb.ac.id/id/eprint/6871

Actions (login required)

View Item View Item