Analisis Perbandingan Biaya Dan Waktu Pengecoran Sitemix Dan Readymix Pada Proyek Banana Villa 2 Bedroom

Darmawan, I Wayan Simeon and Sudiarta, I Komang and Sukarmawati, Yuliana (2023) Analisis Perbandingan Biaya Dan Waktu Pengecoran Sitemix Dan Readymix Pada Proyek Banana Villa 2 Bedroom. Undergraduate thesis, Politeknik Negeri Bali.

[img] Text (Full Text)
RAMA_22302_2215164027_full.pdf - Accepted Version
Restricted to Repository staff only

Download (12MB) | Request a copy
[img] Text (Cover-Bab 1, Bab 5 dan Referensi)
RAMA_22302_2215164027_0026097704_0028079003_part.pdf - Published Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (12MB)

Abstract

ABSTRAK Pada Proyek Pembangunan Villa Banana 2 Bedroom pengecoran seluruhnya menggunakan readymix dengan bantuan alat concrete pump. Pembangunan villa ini terdiri atas 2 lantai, dan struktur pondasi bawah berupa pondasi boredpile, dan raft pondasi, sedangkan struktur atas adalah kolom lantai 1, balok lantai 1, plat lantai 1, kolom lantai 2, balok rooftop, plat lantai rooftop beton bertulang. Penelitian dilakukan karena kurang efektifnya dilapangan penggunaan readymix di lapangan karena terbatasnya armada truck mixer dengan kapasitas 2,5 m^3 oleh batching plant. Jika dilapangan menggunakan truk mixer dengan kapasitas 5 m^3 akan terkendala akses untuk ke proyek. Tujuan dari penelitian ini melakukan perbandingan dari sisi biaya, waktu, dan mencari alternatif yang lebih baik digunakan dalam proyek Banana Villa 2 Bedroom. Dlam penelitian ini dilakukan perbandingan biaya dan waktu dari pengecoran sitemix dan readymix dengan cara menghitung RAP dan produktivitas pekerja dalam setiap komponen pengecoran struktur Banana Villa 2 Bedroom. Melalui hasil analisis dapat disimpulkan rata-rata perbadingan dari setiap pekerjaan komponen pengecoran Banana Villa 2 Bedroom dengan metode pengecoran sitemix Rp. 1.159.371,56, sedangkan metode pengecoran readymix Rp. 2.066.371,14. Metode pengecoran sitemix jika dilihat dari segi biaya sitemix lebih terjangkau daripada readymix. Alternatif yang lebih efesien dari segi waktu dalam beberapa pekerjaan seperti pondasi borepile, kolom 1st floor, balok dan plat lantai 1st floor, balok dan plat rooftop pengecoran metode sitemix lebih singkat durasi pengerjaannya, hanya pada pekerjaan raft pondasi metode readymix lebih unggul dalam durasi pekerjaan. Kata kunci : Perbandingan, Sitemix, Readymix, Biaya, Waktu Pekerjaan ABSTRACT In the 2 Bedroom Villa Banana Construction Project, the casting is entirely using readymix with the help of a concrete pump. The construction of this villa consists of 2 floors, and the lower foundation structure is in the form of boredpile foundation, and foundation raft, while the upper structure is 1st floor column, 1st floor beam, 1st floor plate, 2nd floor column, rooftop beam, reinforced concrete rooftop floor plate. The research was conducted due to the ineffectiveness in the field of readymix use in the field due to the limited fleet of mixer trucks with a capacity of 2.5 m^3 by batching plant. If in the field using a mixer truck with a capacity of 5 m^3, access to the project will be constrained. The purpose of this study is to compare in terms of cost, time, and find better alternatives used in the Banana Villa 2 Bedroom project. Through the results of the analysis, it can be concluded that the average comparison of each Banana Villa 2 Bedroom casting component work with the sitemix casting method is Rp. 1,159,371.56, while the readymix casting method is Rp. 2,066,371.14. Sitemix casting method when viewed in terms of cost sitemix is more affordable than readymix. A more time-efficient alternative in some jobs such as borepile foundations, 1st floor columns, 1st floor beams and plates, beams and plates casting rooftop sitemix method shorter duration of work, only in raft work the readymix method foundation is superior in duration of work. Keywords : Comparison, Sitemix, Readymix, Cost, Time of Work

Item Type: Thesis (Undergraduate)
Subjects: Ilmu Teknik
Ilmu Teknik > Teknik Sipil Dan Perencanaan Tata Ruang > Teknologi Alat Berat
Ilmu Teknik > Teknik Sipil Dan Perencanaan Tata Ruang > Bidang Teknik Sipil Lain Yang Belum Tercantum
Ilmu Teknik > Ilmu Keteknikan Industri > Teknik Material (Ilmu Bahan)
Divisions: Jurusan Teknik Sipil > Prodi D4 Manajemen Proyek Konstruksi > Skripsi
Depositing User: I Wayan Simeon Darmawan
Date Deposited: 10 Sep 2023 21:41
Last Modified: 10 Sep 2023 21:41
URI: http://repository.pnb.ac.id/id/eprint/9698

Actions (login required)

View Item View Item