Ariawandana, I Gusti Agung Surya (2025) Analisis Perbandingan Produktivitas Pekerjaan Struktur Lantai 3 Berdasarkan Lapangan dan AHSP (Analisa Harga Satuan Pekerjaan) Kabupaten Badung 2023 Studi Kasus Pembangunan Gedung Kantor PT. Tunas Jaya Sanur Group. Undergraduate thesis, Politeknik Negeri Bali.

[thumbnail of Full Tex] Text (Full Tex)
RAMA_22302_2315164010_Full.pdf - Accepted Version
Restricted to Repository staff only

Download (6MB) | Request a copy
[thumbnail of Cover, Bab 1, Bab 5, dan Refrensi] Text (Cover, Bab 1, Bab 5, dan Refrensi)
RAMA_22302_2315164010_0016085814_0013119302_Part.pdf - Accepted Version

Download (1MB)
[thumbnail of iThenticate] Text (iThenticate)
RAMA_22302_2315164010_iThenticate.pdf - Accepted Version
Restricted to Repository staff only

Download (1MB) | Request a copy

Abstract

ANALISIS PERBANDINGAN PRODUKTIVITAS PEKERJAAN STRUKTUR LANTAI 3 BERDASARKAN LAPANGAN DAN AHSP (ANALISA HARGA SATUAN PEKERJAAN) KABUPATEN BADUNG 2023 (Studi Kasus: Pembangunan Gedung Kantor PT. Tunas Jaya Sanur Group) I GUSTI AGUNG SURYA ARIAWANDANA Program Studi D4 Manajemen Proyek Konstruksi, Jurusan Teknik Sipil, Politeknik Negeri Bali Jl. Raya Uluwatu No. 45, Jimbaran, Kuta Selatan, Kabupaten Badung, Bali E-mail: gung9322@gmail.com. ABSTRAK Sumber daya manusia merupakan faktor utama dalam keberhasilan proyek konstruksi. Pelaksanaan pembangunan membutuhkan tenaga kerja yang kompeten agar produktivitas sesuai kondisi lapangan tercapai, sehingga proyek dapat diselesaikan tepat waktu, efisien, dan efektif. Penelitian ini bertujuan mengetahui dan membandingkan produktivitas tenaga kerja pada pekerjaan struktur kolom proyek Pembangunan Gedung Kantor PT. Tunas Jaya Sanur Group. Metode penelitian menggunakan observasi langsung dengan mencatat volume, durasi, jumlah tenaga kerja, serta produktivitas harian pada pekerjaan pembesian, bekisting, dan pengecoran. Hasil analisis kemudian dibandingkan dengan standar AHSP Kabupaten Badung Tahun 2023 untuk mengetahui perbedaan produktivitas antara kondisi lapangan dan acuan yang berlaku. Hasil penelitian menunjukkan adanya perbedaan produktivitas antara kondisi lapangan dengan AHSP Kabupaten Badung Tahun 2023.Pada kolom, pembesian 10.685,51 kg lebih tinggi 3,88% dari 10.285,92 kg, bekisting 1.304,00 m² naik 821,03% dari 141,58 m², sedangkan pengecoran 116,60 m³ turun 48,22% dari 225,16 m³. Pada balok, pembesian 15.143,96 kg naik 34,18% dari 11.285,92 kg, bekisting 522,33 m² naik 74,17% dari 299,89 m², pengecoran 33,81 m³ turun 89,79% dari 332,35 m³. Pada plat lantai, pembesian wiremesh turun 86,04%, bekisting bondek naik 67,92%, dan pengecoran turun 14,08% Kata Kunci: Tenaga Kerja, Produktivitas, Koefesien Produktivitas, AHSP 2023  ANALYSIS OF PRODUCTIVITY COMPARISON FOR 3RD FLOOR STRUCTURAL WORK BASED ON FIELD DATA AND AHSP (UNIT PRICE ANALYSIS) BADUNG REGENCY 2023 (Case Study: Construction of PT. Tunas Jaya Sanur Group Office Building) I GUSTI AGUNG SURYA ARIAWANDANA Study Program of D4 Construction Project Management, Civil Engineering Department, Politeknik Negeri Bali Jl. Raya Uluwatu No. 45, Jimbaran, Kuta Selatan, Badung Regency, Bali, Indonesia E-mail: gung9322@gmail.com ABSTRACT Human resources are the main factor in the success of construction projects. Project implementation requires competent workers so that productivity matches field conditions, enabling projects to be completed on time, efficiently, and effectively. This study aims to identify and compare labor productivity in structural column works on the Office Building Construction Project of PT. Tunas Jaya Sanur Group. The research method used was direct observation by recording work volume, duration, number of workers, and daily productivity in reinforcement, formwork, and concreting activities. The analysis results were then compared with the Badung District AHSP 2023 standard to determine differences between field conditions and the reference values. The results show significant differences in productivity. For column works, reinforcement of 10,685.51 kg was 3.88% higher than 10,285.92 kg, formwork of 1,304.00 m² increased by 821.03% from 141.58 m², while concreting of 116.60 m³ decreased by 48.22% from 225.16 m³. For beams, reinforcement of 15,143.96 kg rose 34.18% from 11,285.92 kg, formwork of 522.33 m² increased by 74.17% from 299.89 m², and concreting of 33.81 m³ fell 89.79% from 332.35 m³. For floor slabs, wiremesh reinforcement decreased by 86.04%, bondek formwork increased by 67.92%, and concreting decreased by 14.08%. Keywords: Labor, Productivity, Productivity Coefficient, AHSP 2023

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Koefisien Tenaga kerja. Produktivitas, Analisis Harga Satuan Pekerjaan
Subjects: Ilmu Teknik > Teknik Sipil Dan Perencanaan Tata Ruang
Divisions: Jurusan Teknik Sipil > Prodi D4 Manajemen Proyek Konstruksi > Skripsi
Depositing User: I Gusti Agung Surya Ariawandana
Date Deposited: 17 Sep 2025 23:13
Last Modified: 17 Sep 2025 23:13
URI: https://repository.pnb.ac.id/id/eprint/21528

Actions (login required)

View Item View Item