Putra, I Made Juli Adhi (2024) The Project of The Largest Passenger Aircraft Deployment Emirates A380 in I Gusti Ngurah Rai International Airport Bali. Masters thesis, Politeknik Negeri Bali.
Text (Cover - Bab 1, Bab 6 dan Referensi)
RAMA_93103_2215885030_0028126306_0020106508_part.pdf - Accepted Version Available under License Creative Commons Attribution Non-commercial Share Alike. Download (2MB) |
|
Text (Full Text)
RAMA_93103_2215885030_full.pdf - Accepted Version Restricted to Repository staff only Download (4MB) | Request a copy |
|
Text (iThenticate)
RAMA_93103_2215885030_iThenticate.pdf - Accepted Version Restricted to Repository staff only Download (2MB) | Request a copy |
Abstract
The largest passenger aircraft deployment Emirates Airbus A380 in Bali was a biggest project for Indonesian aviation with purpose to assess the compatibility of the airport in handling Airbus A380 aircraft, the readiness of ground service providers to handle the aircraft and to analyse how was the result of the project. The methodology using mix method qualitative and quantitative data which collected by observation, interview, checklist and documentation. The data analysis focusing on 4 pillars of project success measurement include time, cost, health and safety and profitability. Project operation stage started from initiation stage with feasibility study by Emirates, followed by planning stage, execution stage, monitoring stage and closing stage. The airport compatibility was assessed jointly by Emirates and airport authorities to determine area of concerns and agreed action items to comply with ICAO Annex 14 – Aerodrome for Code F aircraft (A380) operation. The readiness of ground service providers assessed by Emirates consist of ground support equipment availability and compatibility to serve A380 aircraft, personnel training/license and updated procedures. Each party prepared safety risk assessments to identify potential hazards, probability, mitigation and its consequences in order to manage the risk within the acceptable risk level. It concluded airport was compatible and ground service provider ready to handle the aircraft and project commenced. The result of the project was measured using 4 pillars where each party has completed the assigned action item timely, cost associated, health and safety performance and profitability with successful result. Proud of the Indonesian aviation stakeholders for great milestone in handling regular A380 operation in Bali, the first A380 regular operation in Indonesia and create fabulous publicity for airport and Emirates.
Item Type: | Thesis (Masters) |
---|---|
Uncontrolled Keywords: | Aviation Project, Emirates Airbus A380, Project Stage and Result |
Subjects: | Ilmu Sosial Humaniora > Ilmu Sosial |
Divisions: | Jurusan Pariwisata > Prodi S2 Perencanaan Pariwisata > Tesis |
Depositing User: | I Made Juli Adhi Putra |
Date Deposited: | 02 Aug 2024 04:44 |
Last Modified: | 02 Aug 2024 04:44 |
URI: | http://repository.pnb.ac.id/id/eprint/10760 |
Actions (login required)
View Item |